Live on 15 Acres and am in the process of building a 3700+ foot mainline in 7 1/4 inch gauge. I have laid 170'of track from the 3000' of steel rail from RMI as well as 17 frogs and 15000 railway ties mostly Hemlock. I finished a #7 switch and am still working on finishing the ROW with grades less than 1%.
|